您的位置: 首页 > CMMI认证查询 > 正文

5-D Systems, Inc-CMMI3

Organization Name:
(组织名称)

Organizational Unit:
(组织单位)

Maturity Level:
(成熟度)

Lead Appraiser:
(主任评估师)

Sponsor:
(发起人)

Appraisal End Date:
(评估结束日期)

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All work for the OU is performed at the Round Rock campus)
Customer (Not Relevant: No difference in process is due to Customer requirements at this point)
Size (Not Relevant: All projects in scope are similar in size and the differences do not imply process differences)
Organizational Structure (Not Relevant: All projects follow the same organizational structure guidelines)
Type of Work (Not Relevant: All work is unmanned aircraft related)
Uniqueness: All projects are of the same type For the method we define 2 Factors: – All Projects (The general category all projects belong to) – No Projects (The empty set)
Sampling Factor Values: All Projects (Uniqueness): All projects of the OU
No Projects (Uniqueness): Empty set
Subgroups: All: All Proyects
11 People, 3 Basic Units
– All Projects
标签:

评论一下

电子邮件地址不会被公开。 必填项已用*标注

此站点使用Akismet来减少垃圾评论。了解我们如何处理您的评论数据