您的位置: 首页 > CMMI认证查询 > 正文

Axiom Resource Management, Inc-CMMI3

Organization Name:
(组织名称)

Organizational Unit:
(组织单位)

Maturity Level:
(成熟度)

Lead Appraiser:
(主任评估师)

Sponsor:
(发起人)

Appraisal End Date:
(评估结束日期)

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All work is performed at the Keymind site in Virginia)
Customer (Not Relevant: All projects are for federal customers.)
Size (Not Relevant: Though staff size varies between 4 – 8, people are not dedicated full time to projects. Size has been shown not to have an impact on the way work is performed)
Organizational Structure (Not Relevant: In total 16 people work at Keymind in a flat organizational structure)
Type of Work (Not Relevant: All 4 projects develop web applications using similar technology)
Life cycle used: The life cycle uses is either partially agile (requirements analysis done up front, followed by SCRUM development) or iterative/agile The partially agile projects are T&M, whereas the fully iterative/agile projects are FFP
Type of contract: Two projects are contracted as Time and Material (T&M), while the other two are Firm Fixed Process (FFP) contracts The projects that is FFP are the ones following the iterative/agile lifecycle. Whereas the partially agile projects are T&M
Sampling Factor Values: Partially agile/iterative (Life cycle used): All requirements and high level design done. Coding uses the agile/iterative lifecycle
Fully agile/iterative (Life cycle used): All development activities done in iterations
T&M (Type of contract): Time and Materials
FFP (Type of contract): Firm Fixed Price
Subgroups: T&M/Partially agile: Technical refresh of system. Requirements and design are done up front. Coding follows the agile life cycle 3.5 FTEs
9 People, 2 Basic Units
– Partially agile/iterative
– T&M
FFP/Fully Agile: Technical refresh. Under firm fixed price contract using an agile life cycle 2.5 FTEs
6 People, 2 Basic Units
– FFP
– Fully agile/iterative
标签:

评论一下

电子邮件地址不会被公开。 必填项已用*标注