SHENZHEN ABC COMPUTER SYSTEMS CO., LTD-2014-CMMI3

CMMI认证查询 cmmirz 11年前 (2014-03-07) 531次浏览 0个评论
Organization Name:
(组织名称)
SHENZHEN ABC COMPUTER SYSTEMS CO., LTD
Organizational Unit:
(组织单位)
Software Development Division
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Mar 08, 2014
Lead Appraiser:
(主任评估师)
Mohammed Shareef Paloli
Sponsor:
(发起人)
Yun Yue
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Organization unit is operational from one location at Shenzhen, Guangdong Province, China PRC only and hence not considered to be relevant for sampling.)
Customer (Not Relevant: Organization unit serves Government customers in Shenzhen, Guangdong Province, China PRC and hence not considered to be relevant for sampling.)
Size (Not Relevant: Size the basic units are medium sized (800 person days) in the organizational unit and hence not considered to be relevant for sampling.))
Organizational Structure (Not Relevant: Organizational structure across all the basic units in the organizational unit remains the same and hence not considered to be relevant for sampling.)
Type of Work: Software development life cycle (waterfall, incremental, iterative, waterfall+prototype) is different for all basic units, and developed in the similar technology (Java/WebServices/MINA/Oracle) and hence considered relevant for sampling.
Sampling Factor Values: Waterfall (Type of Work): Software projects following waterfall lifecycle.
Incremental (Type of Work): Software projects following incremental life cycle.
Iterative (Type of Work): Software projects following iterative life cycle.
Waterfall + Prototype (Type of Work): Software projects following waterfall+prototype life cycle.
Subgroups: SG # 1: Software development projects in Waterfall lifecycle.
9 People, 1 Basic Units
– Waterfall
SG # 2: Software development projects in Iterative life cycle.
7 People, 1 Basic Units
– Iterative
SG # 3: Software development projects in Incremental life cycle.
11 People, 1 Basic Units
– Incremental
SG # 4: Software development projects in waterfall + prototype life cycle.
8 People, 1 Basic Units
– Waterfall + Prototype

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:SHENZHEN ABC COMPUTER SYSTEMS CO., LTD-2014-CMMI3
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址