CMMI认证

Israel Aerospace Industries, Ltd.-2013-CMMI5

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All projects are conducted at the same location.)
Customer (Not Relevant: Projects do not change how they operate as a function of the customers. All projects follow the standard product development processes regardless of customer.)
Size: Projects receive different resources as a function of size and scope, therefore some processes are differently executed. However, size is always consistent with technology. E.g., smaller projects are typically self-contained systems or system components and larger projects are typically systems of systems integration efforts.
Organizational Structure (Not Relevant: All projects report through a similar organizational structure.)
Type of Work (Not Relevant: Some specialized development processes are tied to the technology involved. Also, very small (component) projects use slightly different engineering approaches, but otherwise, the overall processes are the same.)
Sampling Factor Values: Small & Medium (Size): Projects up to 200 people.
Large (Size): Projects greater than 200 people.
Subgroups: Large – Systems of Systems: Large Missile systems (think: anti-ballistic or anti-tactical interceptor) THIS SUBGROUP IS BEING COLLAPSED WITH THE “Large-Satellite” SUBGROUP.
366 People, 3 Basic Units
– Large
Small & Medium – Components and self-contained: Think: surface-to-surface, surface-to-air…
479 People, 6 Basic Units
– Small & Medium

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Israel Aerospace Industries, Ltd.-2013-CMMI5