| Sampling Factors: |
Location (Not Relevant: The location is not relevant: TAS motto is that the standard process QMS is applied in any country in the same way.)
Customer (Not Relevant: The customer is not relevant: the same standard process QMS is applied whatever is the customer.)
Size (Not Relevant: Indirectly due to the type of work On board & ground products are small or medium projects. System, satellite & payload are large projects. So this sampling factor exists, but it don”t generate additional sub group.)
Organizational Structure (Not Relevant: The organizational structure is not relevant: TAS motto is that the standard process QMS is applied in any country in any Dpt in the same way.)
Type of Work: 3 sub groups have been defined On Board equipment, Ground product & Large projects (system, satellite & payload). |
| Sampling Factor Values: |
On board equipment (Type of Work): On board equipments include Space Electronic, Mechanical units, Instruments and Components
Ground products (Type of Work): Not on Board Segment and Products
Large (Type of Work): Large projects include Complete Space Systems, Satellites, Space Payload & Satellite with Payload |
| Subgroups: |
ON BOARD: Mainly small & medium projects. Only CMMi DEV will be used. Sometimes SAM practices are pertinent for purchasing
2000 People, 117 Basic Units
– On board equipment
GROUND: Medium projects. Only CMMi DEV will be used
1000 People, 28 Basic Units
– Ground products
LARGE: The 2 models CMMi DEV & CMMi ACQ will be used. 2 Bus will be assessed with all PA”s of the 2 constellations it except organizational PA”s (OPF, OPD & OT)
3000 People, 44 Basic Units
– Large |