Organization Name:
(组织名称)
Anhui Keli Information Industry Co., Ltd.
Organizational Unit:
(组织单位)
Software R & D Center
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Aug 24, 2020
Lead Appraiser:
(主任评估师)
Yanyan Tian
Sponsor:
(发起人)
li liang
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Not Relevant: All projects are executed from Hefei, P R China)

Customer (Not Relevant: Not Relevant: All customers are in the traffic industry)

Size (Not Relevant: Not Relevant:The typical size of project is 7 to 10 FTEs)

Organizational Structure (Not Relevant: Not relevant -All projects are managed by GM)

Type of Work: The work is based on Iteration or Waterfall lifecycle

Sampling Factor Values: Iteration lifecycle (Type of Work): The projects use iteration lifecycle, release an iteration by each month. The whole iteration process includes various types of development activities, such as requirements, design, implementation (coding), deployment, testing, etc. after the iteration is completed, the iteration needs to be completed based on the evaluation results, the objectives of the next iteration are set. Each subsequent iteration is based on the previous iteration to develop and refine the system until the final product

Waterfall lifecycle (Type of Work): The projects use waterfall lifecycle,It defined 6 phases: project planning, requirements analysis, software design, coding phase, software,testing,operation and maintenance. The development results of the former stage are regarded as the input of the later stage, which is like a waterfall and flowing water, and finally the software products are obtained

Subgroups: Iteration lifecycle: The projects use iteration lifecycle, release an iteration by each month. The whole iteration process includes various types of development activities, such as requirements, design, implementation (coding), deployment, testing, etc. after the iteration is completed, the iteration needs to be completed based on the evaluation results, the objectives of the next iteration are set.
20 People, 4 Basic Units
– Iteration lifecycle

Waterfall lifecycle: The projects use waterfall lifecycle,It defined 6 phases: project planning, requirements analysis, software design, coding phase, software,testing,operation and maintenance. The development results of the former stage are regarded as the input of the later stage, which is like a waterfall and flowing water, and finally the software products are obtained
12 People, 2 Basic Units
– Waterfall lifecycle


版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Anhui Keli Information Industry Co., Ltd.-2020-CMMI3
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址