| Sampling Factors: |
Location (Not Relevant: All HBT projects in the OU reside at the same geographical site.)
Customer (Not Relevant: All HBT projects use the same processes for the conduct of development projects regardless of customers.)
Size (Not Relevant: All HBT projects use common processes regardless of size (# of personnel and duration))
Organizational Structure (Not Relevant: HBT is structured under one CEO. The Engineering directorate structured as Systems Engineering, Hardware Engineering and Software Engineering. These groups provide the resources to conduct of projects across the entire organization.)
Type of Work: There are two different types of work that the organizational unit performs (System Development and Integration and Product Development) |
| Sampling Factor Values: |
PD (Type of Work): Product Development Projects
SDI (Type of Work): Systems Development and Integration Projects |
| Subgroups: |
Product Development: All Product Development Projects
106 People, 8 Basic Units
– PD
System Development and Integration: All System Development and Integration Projects
219 People, 20 Basic Units
– SDI |