Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All MGEO projects reside at the same geographical site)
Customer (Not Relevant: All MGEO work is provided under one DOD customer)
Size (Not Relevant: All MGEO projects are multi year and use the same common processes for project management and development regardless of size of the project defined by number of personnel and duration of the project in terms of time.)
Organizational Structure (Not Relevant: MGEO is structured under one CEO. The Engineering directorate structured as Systems Engineering, Hardware Engineering and Software Engineering. These groups provide the resources to conduct of projects across the entire organization)
Type of Work: There are three types of work performed within MGEO: o Product Development, o System Development, o System Integration
Sampling Factor Values: PD (Type of Work): Product Development Projects
SD (Type of Work): Systems Development Projects
SI (Type of Work): Systems Integration Projects
Subgroups: Product Development: Projects developing specific products for the customer
200 People, 8 Basic Units
– PD
System Development: Projects developing System solutions for the customer
141 People, 4 Basic Units
– SD
System Integration: Projects providing system integration activities for the customer
50 People, 2 Basic Units
– SI