| Sampling Factors: |
Location (Not Relevant: All work is performed within Chengdu.)
Customer (Not Relevant: All work is performed only for CAC and is performed in the same manner.)
Size: There are large and small projects. Same processes, but handled through tailoring. With EPG guidance, small projects are able to tailor some steps out of the standard process since some of those processes do not make sense for small projects.
Organizational Structure (Not Relevant: There is only one organizational structure.)
Type of Work (Not Relevant: There are two types of work: investment and scientific, but the work follows the same processes.) |
| Sampling Factor Values: |
Small (Size): Less then 1M RMB in cost
Large (Size): More than 1M RMB in cost |
| Subgroups: |
Software Development – Small: software development for small projects
13 People, 2 Basic Units
– Small
Software Development – Large: software development of large projects
41 People, 4 Basic Units
– Large |