CMMI认证

Ball Aerospace & Technologies Corp.-2013-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: n/a because everything is developed from within a single business center (location))
Customer (Not Relevant: n/a does not make a difference in project management or process ustilization)
Size: is an important factor (small, medium, large)
Organizational Structure (Not Relevant: n/a does not make a difference in project management or process ustilization)
Type of Work: embedded versus simulators (Class 1,2,3,4)
Sampling Factor Values: small (Size): projects of about 2 or 3 persons
medium (Size): projects of 5 or 6 persons
large (Size): projects of 8 or more persons
Embedded space flight (Type of Work): Embedded space flight software projects
Ground Test (Type of Work): Ground Test Software projects
Subgroups: Embedded Large: Embedded Large Projects
50 People, 6 Basic Units
– large
– Embedded space flight
Embedded Small: Embedded Small projects
10 People, 3 Basic Units
– Embedded space flight
– small
Medium Ground Test: Medium Ground Test Projects
35 People, 6 Basic Units
– medium
– Ground Test
Small Ground Test: Small Ground Test projects
9 People, 3 Basic Units
– Ground Test
– small

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Ball Aerospace & Technologies Corp.-2013-CMMI3