Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All work is planned and managed from a single location)
Customer (Not Relevant: All work is performed for the same customer)
Size: There are only large projects
Organizational Structure (Not Relevant: All work is performed the same as there is a single organizational structure)
Type of Work (Not Relevant: All work is of the same type)
Sampling Factor Values: Large (Size): Large projects are estimated to be 1200 hours of effort or more
Non-Large (Size): Non-large projects are estimated to be less than 1200 hours of effort
Subgroups: L: Large project
67 People, 7 Basic Units
– Large