CMMI认证

Beijing Gongke Bridge Technology Co., Ltd.-2017-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Development activities are conducted at one location in Beijing.)
Customer: internal customer and external customer
Size (Not Relevant: All project’s sizes use the processes in the same way. The difference in project size is redundant with the differences in location, size, type of work, org structure, etc., and are therefore subsumed by that factor)
Organizational Structure (Not Relevant: All projects are developed under only a division for SW development; therefore the processes are not different for all projects under this organization. So this factor is not considered for project selection from all divisions. There are no process distinctions made based on the structure.)
Type of Work (Not Relevant: There is only one type of typical work conducted in the org processes.)
Sampling Factor Values: Internal (Customer): Internal customer
External (Customer): External customer
Subgroups: Internal: Internal customer
13 People, 2 Basic Units
– Internal
External: External customer
7 People, 1 Basic Units
– External

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Beijing Gongke Bridge Technology Co., Ltd.-2017-CMMI3