CMMI认证

Beijing Huanya Communication & Information Technology C

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Not Relevant: All projects are working in the same location, so this is not a relevant sampling factor.)
Customer (Not Relevant: Not Relevant: There are only one typology of customer which is related to Law enforcement IT systems.)
Size (Not Relevant: Not Relevant: All projects are not significantly different in size, so this is not a relevant sampling factor.)
Organizational Structure (Not Relevant: Not Relevant: All projects are working under the same organization and management structure, so organizational structure is not a relevant sampling factor.)
Type of Work: Relevant: Projects are based on two different lifecycle models: Waterfall Model and Iterative Model.
Sampling Factor Values: WF (Type of Work): Projects are developed based on Waterfall lifecycle Model
IT (Type of Work): Projects are developed based on Iterative lifecycle Model
Subgroups: SG1: Waterfall lifecycle
7 People, 1 Basic Units
– WF
SG2: Iterative lifecycle
21 People, 3 Basic Units
– IT

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Beijing Huanya Communication & Information Technology C