Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: OU is at the same location)
Customer (Not Relevant: OU customers are wanting the same type of reports and visibility into the projects.)
Size (Not Relevant: OU projects are similar in size)
Organizational Structure (Not Relevant: OU projects have similar structure)
Type of Work: The OU has 2 different types of work: 1. Research and Development Product 2. Customized Development Project
Sampling Factor Values: Product Development (Type of Work): This type of work is for all the research and development efforts within the OU
Customer Development (Type of Work): This type of work is for an particular customer and their own special work case.
Subgroups: Research and Application System of Harmonic Control: Through ARM and FPGA master algorithm this will achieve the entire product logic control.
7 People, 1 Basic Units
– Product Development
Energy storage system research and application project: In response to the needs of the market, through the study of super capacitor, developing a system to meet the rail system energy storage system and to meet the needs of energy feedback.
5 People, 1 Basic Units
– Product Development
High Power Density Module System Control Application System: This project relay to the side of the bridge, the bridge side is sampled using a shunt resistor to achieve product performance
6 People, 1 Basic Units
– Customer Development