CMMI认证

Beijing info Science & Tech CO., Ltd-2018-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Single location (Beijing, China). All BUs of OU are located in the same location. Therefor processes are not implemented differently.)
Customer (Not Relevant: Their customers are mainly financial institutions, so the customer type is single and does not affect the development of the software products or processes implemented.)
Size (Not Relevant: They classify the projects into Large and Small size, but the size is not used as a discriminating factor in process selection.)
Organizational Structure (Not Relevant: Each group within the OU is involved in the specific work at different stages of the project, so the organizational structure does not affect the development of the software products or processes implemented.)
Type of Work (Not Relevant: They have development project and implementation project, but the implementation projects are excluded from the OU, so the type of work is not used as a discriminating factor in process selection.)
Type of Lifecycle: They classify the project lifecycle into waterfall and iteration, the work is done differently and the processes are implemented differently depending on the selected lifecycle model of the projects.
Sampling Factor Values: Waterfall (Type of Lifecycle): Waterfall type means the lifecycle model of the projects is waterfall.
Iteration (Type of Lifecycle): Iteration type means the lifecycle model of the projects is iteration.
Subgroups: SG1: The lifecycle model of the projects in SG1 is Waterfall.
107 People, 7 Basic Units
– Waterfall
SG2: The lifecycle model of the projects in SG2 is iteration.
52 People, 3 Basic Units
– Iteration

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Beijing info Science & Tech CO., Ltd-2018-CMMI3