CMMI认证

Beijing Link Power Information Technology Co., Ltd.-CMM

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All projects are working in the same location (and building) in Beijing, so this is not a relevant sampling factor)
Customer (Not Relevant: Customers don”t influence processes used.)
Size (Not Relevant: All projects are not significantly different in size, so this is not a relevant sampling factor)
Organizational Structure (Not Relevant: All projects are working under the same organization and management structure, so organizational structure is not a relevant sampling factor)
Type of Work: There are 2 type of project, one is new development project which the software developed based on all new requirements, another one is enhancement which means software developed based on some newly added requirements based on a previous version, so type of work is a relevant sampling factor.
Sampling Factor Values: 1. New Developement (Type of Work): Software developed based on all new requirements
2.Enhancement (Type of Work): Software developed based on some newly added requirements based on a previous version.
Subgroups: 1: New development
7 People, 1 Basic Units
– 1. New Developement
2: Enhancement
13 People, 2 Basic Units
– 2.Enhancement

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Beijing Link Power Information Technology Co., Ltd.-CMM