- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location (Not Relevant: All Basic Units within the Org unit perform their tasking at the Beijing city site. As such, there are not differences in implementation in terms of location.) Customer (Not Relevant: All items are commercial customers.)
Size: Large projects: the number of lines of code is greater than 50,000 lines, and the life cycle is standard waterfall
Small items: the number of lines of code is less than 50,000 lines, and the life cycle is V-Waterfall typeOrganizational Structure (Not Relevant: All the basic units fit within the same organizational department, Research and Development Department.)
Type of Work (Not Relevant: All projects are software development projects. They are Client/Server projects.
There is only one type of work in Research and Development Department activities: Software Development)Sampling Factor Values: Large (Size): Large projects: the number of lines of code is greater than 50,000 lines, and the life cycle is standard waterfall type (design phase: there are outline design and detailed design; coding phase: code review uses formal review methods; testing phase: there are integration tests and system tests). Small (Size): Small items: the number of lines of code is less than 50,000 lines, and the life cycle is V-Waterfall type (design phase: summary design and detailed design are combined into detailed design; coding phase: code review uses informal review methods; testing phase: integration testing and system testing are combined into integration and system testing).
Subgroups: Large: Large projects: the number of lines of code is greater than 50,000 lines, and the life cycle is standard waterfall type (design phase: there are outline design and detailed design; coding phase: code review uses formal review methods; testing phase: there are integration tests and system tests).
5 People, 1 Basic Units
– LargeSmall: Small items: the number of lines of code is less than 50,000 lines, and the life cycle is V-Waterfall type (design phase: summary design and detailed design are combined into detailed design; coding phase: code review uses informal review methods; testing phase: integration testing and system testing are combined into integration and system testing).
11 People, 2 Basic Units
– Small