CMMI认证

BEIJING URBAN CONSTRUCTION INTELLIGENT CONTROL CO.,LTD-

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All work is conducted in the Beijing offices)
Customer (Not Relevant: There is only Enterprise for which we apply the same selection of processes selected from the organizational standard processes)
Size (Not Relevant: The projects are all medium sized project using the following Size: time<3 months,=”” small;=”” 3months=””>< 6months,=”” medium;=”” time=””> 6 Large)
Organizational Structure (Not Relevant: All development is conducted in the Software Development Department using the Organisations Standard Processes)
Type of Work: 2 projects are Platform using the full range of Organisation Processes and 2 Product, using the appropriate range of Organisation Processes
Sampling Factor Values: Platform (Type of Work): using the full range of Organisation Processes
Product (Type of Work): using the appropriate range of Organisation Processes
Subgroups: Group A: Platform using the full range of Organisation Processes
13 People, 2 Basic Units
– Platform
Group B: Product using the appropriate range of Organisation Processes
13 People, 2 Basic Units
– Product

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:BEIJING URBAN CONSTRUCTION INTELLIGENT CONTROL CO.,LTD-