CMMI认证

Bharat Forge Limited-2019-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: OU performs its activities from Pune location only hence there is no process variation observed based on location.)
Customer (Not Relevant: All the project executed are for external customers and has no bearing on process execution)
Size (Not Relevant: There is no significant variation observed in project sizing hence no process variation observed based on sizing.)
Organizational Structure (Not Relevant: Project managers and other participants follow the same standard process and report to same senior management. The organizational structure does not drive a different process to be followed.)
Type of Work: OU performs engineering design activities for different types of products and hence could have a bearing on process performance
Sampling Factor Values: Engine (Type of Work): This includes projects for Engine related components
Transmission (Type of Work): This includes projects for transmission related components
Chassis (Type of Work): This includes projects for chassis related components
Subgroups: G1: This includes projects for engine related components
49 People, 7 Basic Units
– Engine
G2: This includes projects for transmission related components
5 People, 1 Basic Units
– Transmission
G3: This includes projects for chassis related components
7 People, 1 Basic Units
– Chassis

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Bharat Forge Limited-2019-CMMI3