| Sampling Factors: |
Location (Not Relevant: All work is performed at one location)
Customer: Certain customers require significant time constraints
Size (Not Relevant: Not a large deviation between projects)
Organizational Structure (Not Relevant: All work is performed within a single structure)
Type of Work (Not Relevant: All work is software development)
Life Cycle: Some projects combine the Scope and Design phases into a single phase |
| Sampling Factor Values: |
RAD-Standard (Customer): Projects are required to complete the Design phase within 52 business days using the standard life cycle
RAD-Combined S/D (Customer): Project schedule is prepared within the 52 business days constraint using a combined Scope/Design phase
Standard (Life Cycle): Projects perform all major phases within the Standard Lifecycle
Combined Scope/Design (Life Cycle): Projects combine the scope and design phase into a single phase |
| Subgroups: |
RAD-Standard: RAD-Standard
26 People, 1 Basic Units
– RAD-Standard
RAD-Combined S/D: RAD-Combined S/D
17 People, 4 Basic Units
– RAD-Combined S/D
Standard: Standard
60 People, 3 Basic Units
– Standard
Combined Scope/Design: Combined Scope/Design
86 People, 3 Basic Units
– Combined Scope/Design |