| Sampling Factors: |
Location (Not Relevant: There exists only one location for the system development center so there is no impact on how the projects are developed. [Not Relevant].)
Customer (Not Relevant: Regardless of the type of customer external or internal, processes are same. So there is no impact of process adoption. [Not Relevant].)
Size: Large Size projects are greater than >40 Technical Head Count Months (THCM). Average Size projects are less than <40 thcm.=”” all=”” types=”” of=”” projects=”” follow=”” all=”” the=”” process=”” areas=”” according=”” to=”” process=”” descriptions=””>
Organizational Structure (Not Relevant: Support level is provided at enterprise level as per described processes so org structure does not impact the way work is performed. [Not Relevant].)
Type of Work (Not Relevant: Different type of work (large or average) does not affect processes utilization. [Not Relevant]) |
| Sampling Factor Values: |
Large Size (Size): Large Size projects are greater than >40 Technical Head Count Months (THCM).
Average Size (Size): Average Size projects are less than <40> |
| Subgroups: |
Large Size: Large Size projects are greater than >40 Technical Head Count Months (THCM).
7 People, 1 Basic Units
– Large Size
Average Size: Average Size projects are less than <40>
10 People, 2 Basic Units
– Average Size |