CMMI认证

Boser Technology Co., Ltd.-2019-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Single location (Beijing, China). All BUs of OU are located in the same location. Therefor processes are not implemented differently.)
Customer (Not Relevant: The customers of the OU cover a wide variety of industries, including military, transportation, government, health, industry, communications and education, and the customer type does not affect the development of the software products or processes implemented.)
Size (Not Relevant: They classify the projects into Large and Small to Medium size, but the size is not used as a discriminating factor in process selection.)
Organizational Structure (Not Relevant: The organizational structure does not affect the development of the software products or processes implemented.)
Type of Work: Type of work is relevant. The work is done differently depending on the type of work. The processes are implemented differently depending on the type of work performed.
Sampling Factor Values: System integration projects (Type of Work): System integration projects are those whose deliverables include not only software products but also hardware products and services.
Pure software projects (Type of Work): Pure software projects are those whose deliverables include only software products and related services.
Subgroups: SG1: SG1 can be considered as a group of system integration projects involving both software and hardware.
10 People, 2 Basic Units
– System integration projects
SG2: SG2 can be considered as a group of software development projects.
7 People, 2 Basic Units
– Pure software projects

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Boser Technology Co., Ltd.-2019-CMMI3