| Sampling Factors: |
Location (Not Relevant: All work is performed at the same location.)
Customer (Not Relevant: Since the products are “product lines” the customers don”t change how the work is done.)
Size (Not Relevant: Work does not change as a function of project size. Projects are generally the same LOE from an engineering and project management perspective.)
Organizational Structure (Not Relevant: Same organization oversees all work in scope.)
Type of Work: Different types of work for systems and software (as well as for different product lines). |
| Sampling Factor Values: |
Brakes (Type of Work): Braking systems and software.
Doors (Type of Work): Door systems and software.
HVAC (Type of Work): HVAC systems and software. |
| Subgroups: |
Group 1: ALL Doors
3 People, 2 Basic Units
– Doors
Group 2: All HVAC
11 People, 6 Basic Units
– HVAC
Group 3: ALL Brakes
40 People, 23 Basic Units
– Brakes |