CMMI认证

Teledyne Brown Engineering, Inc.-2015-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All work is performed at the same location)
Customer (Not Relevant: Work is performed the same for all customers)
Size (Not Relevant: All size projects follow the same procedures)
Organizational Structure: Scope is three individual projects with different project managers and teams
Type of Work (Not Relevant: All types of work follow the same procedures)
Sampling Factor Values: NHRC (Organizational Structure): Naval Health Research Center
OSF (Organizational Structure): Objective Simulation Framework
EADSIM (Organizational Structure): Force-on-Force Simulation of Air, Missile & Space Warfare
Subgroups: P1: Project 1
28 People, 1 Basic Units
– NHRC
P2: Project 2
92 People, 1 Basic Units
– OSF
P3: Project 3
35 People, 1 Basic Units
– EADSIM