| Sampling Factors: |
Location (Not Relevant: Though systems/software development is performed in two geographically separate buildings, location is not a factor in how work is performed.)
Customer (Not Relevant: Processes used in systems/software development do not differ by customer)
Size: The organization is primarily involved in complex systems and software projects. All development and maintenance projects estimated at under $500,000 at CAE ISS-OES are excluded from the scope of the appraisal.
Organizational Structure (Not Relevant: Organizational structure is not a factor in how work is performed)
Type of Work (Not Relevant: Processes are currently geared to the complex systems/software development work being performed. Type of work is not a factor in how work is performed.) |
| Sampling Factor Values: |
Systems/software development (Size): Projects estimated at over $500,000 which are carried out at two separate locations in Mirabel, Quebec by CAE ISS-OES and delivered to external clients.
Small projects (Size): All projects estimated at under $500,000. They have been excluded from the scope of the appraisal |
| Subgroups: |
Systems/Software Engineering Support, fleet operations and maintenance management information system: provides complex system/software solutions operating in critical environments
78 People, 3 Basic Units
– Systems/software development |