CMMI认证

Ceinsys Tech Ltd-2018-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All services originate from a single location, hence it is not a potential differentiator.)
Customer (Not Relevant: Same service life-cycle is followed for each customer, and all are government customers, thus it is not a potential differentiator.)
Size (Not Relevant: Team sizes for the services do not matter, as the tasks are the same for a particular type of work)
Organizational Structure (Not Relevant: OU is located in a single service location with a singular management structure. Thus it is not a potential differentiator.)
Type of Work: There are 3 types of services: 1.GIS Services 2. Consultancy transport 3. Consultancy water
Sampling Factor Values: GIS (Type of Work): Geospatial Solution and Services (GIS)
Consultancy- water (Type of Work): Water Engineering and Design (Water Consultancy)
Consultancy – Transport (Type of Work): Transportation Engineering and Design (Transport Consultancy)
Subgroups: GIS: GIS-based water supply scheme mapping including consumer survey, hydraulic modeling, water audit, and reforms implementation
497 People, 9 Basic Units
– GIS
Water: Developing strategy and Implementation action plan for reduction of Non-revenue water for Packag-3 consisting of Sambalpur, Rourkela, Baripada and Behrampur cities
28 People, 12 Basic Units
– Consultancy- water
Transport: Preparation of detailed project report for Toll Operate Transfer to raise the revenue by Union Government through monetising of National Highway Road Asset against upfront payment of NHAI.
18 People, 5 Basic Units
– Consultancy – Transport

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Ceinsys Tech Ltd-2018-CMMI3