CMMI认证

Centre for Development Of Telematics-2017-CMMI5

Sampling Summary:
(抽样汇总)
Sampling Factors: Location: Project teams are predominantly location centric and are executed largely within a location. Hence a need to understand consistency of deployment across locations
Customer (Not Relevant: OU is a R & D unit. Processes are seldom influenced based on customer or customer category.)
Size (Not Relevant: Every project consists of teams from one or more domain specific sub-teams. These teams are typically a maximum of 8 to 10 people. Hence, size is not relevant.)
Organizational Structure (Not Relevant: Projects are delivered through cross functional teams. To that extent the organizational structure is not relevant for sampling basic units as basic units cut across the teams.)
Type of Work: Projects are of multiple types encompassing one or more disciplines.
Sampling Factor Values: Bangalore (Location): Projects executed from Bangalore
Delhi (Location): Projects executed from Delhi
Hw (Type of Work): Projects that consist of Hardware work only
Sw (Type of Work): Projects that consist of Software work only
Both (Type of Work): Projects that involve both hardware and software work
Subgroups: Hw Blr: Projects that are based in Bangalore performing Hardware work
12 People, 1 Basic Units
– Bangalore
– Hw
Sw Blr: Projects that are based in Bangalore performing Software work
32 People, 1 Basic Units
– Sw
– Bangalore
Both Blr: Projects that are based in Bangalore performing Hardware and Software work
42 People, 2 Basic Units
– Bangalore
– Both
Sw Del: Projects that are based in Delhi performing Software work
37 People, 2 Basic Units
– Sw
– Delhi
Both Del: Projects that are based out of Delhi performing hardware and software work
86 People, 3 Basic Units
– Delhi
– Both

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Centre for Development Of Telematics-2017-CMMI5