| Sampling Factors: |
Location (Not Relevant: Single location of the OU in Chengdu; so location is not a relevant sampling factor.)
Customer (Not Relevant: All projects in execution address the education domain/industry. Relevance of customer type as a sampling factor does not apply also because no customer specified life-cycles are in use.)
Size (Not Relevant: Projects in execution are very similar in characteristics, profile and scope. Size is not a relevant sampling factor.)
Organizational Structure (Not Relevant: The full OU comprising of the only sub-group R&D Center is in scope; organization structure does not apply as a sampling factor.)
Type of Work: All projects in the execution context executing Java projects using Waterfall method |
| Sampling Factor Values: |
ALL Projects (Type of Work): All Java development projects in execution following a Waterfall method.
NO Projects (Type of Work): Appraisal results apply to all projects currently in execution; no projects have been excluded |
| Subgroups: |
R&D Center: R&D Center of Chengdu Comsys Information Tech. Co., Ltd., is the single sub-group executing Java development projects.
84 People, 6 Basic Units
– ALL Projects |