CMMI认证

China Energy Engineering Group Guangdong Electric Power

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All work is performed in the same location.)
Customer (Not Relevant: The same processes are used regardless of the customer being supported.)
Size: Large (>7months) and small projects (<7 months)=”” are=”” performed=””>
Organizational Structure (Not Relevant: All work is performed under one organization structure.)
Type of Work (Not Relevant: The same processes are used regardless of the type of work.)
Sampling Factor Values: Large (Size): Projects that are greater than 7 months in duration
Small (Size): Projects that are less than 7 months in duration.
Subgroups: Large Software Development: Projects that are greater than 7 months
5 People, 1 Basic Units
– Large
Small Software Development: Projects that are less than 7 months in duration
8 People, 2 Basic Units
– Small

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:China Energy Engineering Group Guangdong Electric Power