CMMI认证

Chongqing Botong Water Conservancy Information Network

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Not relevant: All Projects are in the same location.)
Customer (Not Relevant: Not relevant: There is only one type of customer.)
Size (Not Relevant: Not relevant: All projects are similar size.)
Organizational Structure (Not Relevant: Not relevant; Only one Technical Department.)
Type of Work (Not Relevant: Not relevant: There is only one type of work in R&D activities.)
Entire Organization: All basic units in the OU
Sampling Factor Values: 1 (Entire Organization): All basic units.
0 (Entire Organization): No basic unit.
Subgroups: Group1: All basic units
74 People, 8 Basic Units
– 1

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Chongqing Botong Water Conservancy Information Network