CMMI认证

Chongqing Hualong Newsnet Group Co., Ltd.-2020-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All projects are developed in a single centralized location in Chongqing.)

Customer (Not Relevant: Customers does not affect the way of doing work.)

Size (Not Relevant: There is no specific classification of projects into Large Medium Small buckets. There’s no difference in doing work due to the project size.)

Organizational Structure (Not Relevant: All projects are developed following same processes.)

Type of Work: There are two types of work: waterfall development, or iteration development. The type of work may affect the engineering and management processes.

Sampling Factor Values: Waterfall Development (Type of Work): Projects that developed using waterfall lifecycle model.

Iteration Development (Type of Work): Projects that developed using iteration lifecycle model.

Subgroups: Waterfall: Projects that use waterfall lifecycle model.
22 People, 2 Basic Units
– Waterfall Development

Iteration: Projects that use iteration lifecycle model.
14 People, 1 Basic Units
– Iteration Development


版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Chongqing Hualong Newsnet Group Co., Ltd.-2020-CMMI3