CMMI认证

LG CNS-2014-Sponsor Requests No ML

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Not Relevant: All work is performed at the same location, so this is not relevant sampling factor)
Customer (Not Relevant: Not Relevant: All work is performed for and delivered to the same customer, so customer is not a relevant sampling factor.)
Size (Not Relevant: Not Relevant: All projects are roughly the same size, so size is not a relevant sampling factor)
Organizational Structure: Relevant: There is two types of organizational groups for R&D such as productivity tools project group and solution project group, so org structure is a relevant sampling factor.
Type of Work (Not Relevant: Not Relevant: The work performed is software development, so type of work is not a relevant sampling factor)
Sampling Factor Values: Project Group 1 (Organizational Structure): This group develops the tools to improve web and mobile software development productivity such as open framework, automation tools etc.
Project Group 2 (Organizational Structure): This group develops the various solutions such as smart platform, analytics solution, Autopilot, connect architecture etc.
Subgroups: Productivity Tools Project Group: This group develops the tools to improve web and mobile software development productivity such as open framework, automation tools etc.
33 People, 4 Basic Units
– Project Group 1
Solution Project Group: This group develops the various solutions such as smart platform, analytics solution, Autopilot, connect architecture etc
34 People, 5 Basic Units
– Project Group 2