| Sampling Factors: |
Location (Not Relevant: Only one location. (Durham, NC) All projects follow the same process assets.)
Customer (Not Relevant: Projects in the OU are done for the one customer, hence not a driver of process variation.)
Size (Not Relevant: Typical project size is between 5-12 people but all projects are required and go through implementation of the single Process Asset Library(PAL). Hence the size factor is not a driver for process variances or any major differences.)
Organizational Structure (Not Relevant: No intrinsic org structure to differ any process implementation.)
Type of Work (Not Relevant: Not relevant since all work is software development type and is the chosen domain)
All Work: Includes all the work performed by the OU. |
| Sampling Factor Values: |
S1 (All Work): The single group that contains all the projects.
Other (All Work): This is an Empty Set – There are no other projects or work relevant in the OU, created to ensure creation of a single subgroup. |
| Subgroups: |
SG1: Single subgroup of 4 total projects in defined OU
40 People, 4 Basic Units
– S1 |