CMMI认证

Suzhou Conswin Information Tech Co., Ltd.-2016-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: The entire OU is the sample.)
Customer (Not Relevant: The entire OU is the sample.)
Size (Not Relevant: The entire OU is the sample.)
Organizational Structure (Not Relevant: The entire OU is the sample.)
Type of Work (Not Relevant: The entire OU is the sample.)
Project Existence: The entire organization is being sampled in this appraisal. Use existent projects vs non-existent projects to distinguish projects.
Sampling Factor Values: All Projects (Project Existence): This contains all projects in the OU.
No Projects (Project Existence): This contains no projects in the OU.
Subgroups: Universal Set: This subgroup contains all projects in the OU.
15 People, 1 Basic Units
– All Projects

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Suzhou Conswin Information Tech Co., Ltd.-2016-CMMI3