- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location: Work is performed in 3 locations, Austin, San Jose and Penang
Customer (Not Relevant: No customer involvement or requirements related to process management and related activities.)
Size (Not Relevant: All projects in the OU are “small” (~5 or less))
Organizational Structure (Not Relevant: All projects in the OU work within a standard structure)
Type of Work: “Traditional” methods and life cycle vs Open Source methods and life cycleSampling Factor Values: AUS (Location): Projects performed / staged at the Austin facility
PEN (Location): Projects performed / staged at the Penang facility
SJC (Location): Projects performed / staged at the San Jose facility
OS (Type of Work): Projects use “open source” methods and life cycles
STD (Type of Work): Projects use “standard methods” and life cyclesSubgroups: AUS/STD: Austin, standard development
3 People, 3 Basic Units
– AUS
– STD
AUS/OS: Austin, Open Source development
4 People, 2 Basic Units
– AUS
– OS
PEN/OS: Penang, open source development
7 People, 6 Basic Units
– OS
– PEN
SJC/OS: San Jose, Open Source development
1 People, 1 Basic Units
– SJC
– OS
SJC/STD: San Jose, standard development
2 People, 2 Basic Units
– SJC
– STD