| Sampling Factors: |
Location (Not Relevant: Location = Location was analyzed and determined that it does not drive differences in how the work is performed.)
Customer: Customer = Currently there is only one customer, the USMC.
Size (Not Relevant: Size = Resources. Funding source and size in dollar value were analyzed and determined that they do not drive differences in which the work is performed.)
Organizational Structure (Not Relevant: Organizational Structure. Organizational Structure was analyzed and determined that it does not drive differences in how the work is performed.)
Type of Work (Not Relevant: Type of work = Engineering Development. Types of work was analyzed and determined that it does not differentiate how work is performed.) |
| Sampling Factor Values: |
SW Development (Customer): This is key to the success of the MCTIMS project.
Training (Customer): Another critical value is the training necessary for the MCTIMS product. |
| Subgroups: |
Software Development Practice: The basis for the entire company is having a standard successful Software Development Practice.
20 People, 1 Basic Units
– SW Development |