CMMI认证

Strongbridge Corporation-2013-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Only one location is involved. Not relevant.)
Customer (Not Relevant: Only one major customer, the DOT. Not relevant.)
Size (Not Relevant: Small OU of 10 people total of 3 total projects; Not relevant to drive process constraints or variations.)
Organizational Structure (Not Relevant: Small OU, Software Dev is involved No other units or structure within.)
Type of Work (Not Relevant: All software Dev included. No other types. Not relevant.)
All Work: Includes all Work. To create a single subgroup.
Sampling Factor Values: S1 (All Work): Includes the 3 total projects.
Other (All Work): This is an Empty Set – There are no other projects or work relevant in the OU, created to ensure creation of a single subgroup.
Subgroups: SG1: Includes all the three total projects. All are sampled.
17 People, 3 Basic Units
– S1

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Strongbridge Corporation-2013-CMMI3