CMMI认证

Cyber Infrastructure Private Limited-2017-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Single location)
Customer (Not Relevant: There are no specific requirements from any customer. Thus, all projects follow the same process irrespective of customer)
Size (Not Relevant: There is no specific impact on the process to be followed because of size of the projects.)
Organizational Structure (Not Relevant: This is one group where all follow the same process)
Type of Work: There are different technologies being used for projects and there is a possibility of there being a difference in the process being followed.
Sampling Factor Values: Group1 (Type of Work): dot net project
Group2 (Type of Work): php project
Group3 (Type of Work): Other technology project
Subgroups: Group1: dot net project
12 People, 2 Basic Units
– Group1
Group2: php project
31 People, 5 Basic Units
– Group2
Group3: other technology project
5 People, 1 Basic Units
– Group3

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Cyber Infrastructure Private Limited-2017-CMMI3