| Sampling Factors: |
Location (Not Relevant: Only 1 location)
Customer (Not Relevant: Work is done the same way regardless of the customer.)
Size (Not Relevant: Work is done the same way regardless of project size.)
Organizational Structure (Not Relevant: All work is project structured. The process followed is the same for each project.)
Type of Work (Not Relevant: All work follows the same set of processes with slight tailoring guidelines)
FP size: FP size – function points greater than or equal to 600, or less than 600 fp.
lifecycle: lifecycle used: iteration or waterfall |
| Sampling Factor Values: |
Big (FP size): function points greater than or equal to 600
Small (FP size): function points fewer than 600 fp.
Waterfall (lifecycle): projects using waterfall lifecycle
iteration (lifecycle): projects using iteration lifecycle |
| Subgroups: |
Big & Iteration Projects: Big projects using Iteration lifecycle
35 People, 3 Basic Units
– Big
– iteration
Big & Waterfall Projects: Big projects using Waterfall lifecycle
18 People, 2 Basic Units
– Waterfall
– Big
Small & Waterfall Projects: Small projects using Waterfall lifecycle
22 People, 4 Basic Units
– Small
– Waterfall
Small & Iteration Projects: Small projects using Iteration lifecycle
25 People, 4 Basic Units
– iteration
– Small |