| Sampling Factors: |
Location: Location matters as ISE-IT projects are located in two major location CONUS and OCONUS.
Customer (Not Relevant: Customers vary but all process are followed even if the customer thinks they are not needed.)
Size (Not Relevant: Size does not change the tailored design/build process.)
Organizational Structure (Not Relevant: Organizational structure is not relevant as ISE-IT work as integrated teams that support multiple projects.)
Type of Work (Not Relevant: Type of work is not relevant as the integrated team is used and interchanged for both locations.) |
| Sampling Factor Values: |
OCONUS (Location): EPOC is the largest Europe project and NSHQ is added for sampling.
CONUS (Location): TINMAN is the largest project and is supplemented with 3 other USA project for sampling. |
| Subgroups: |
G2: Subgroup contains 2 Europe Projects.
75 People, 2 Basic Units
– OCONUS
G1: Subgroup contains 4 projects
32 People, 4 Basic Units
– CONUS |