CMMI认证

M.C. Dean Inc. Integrated Systems Engineering – Informa

Sampling Summary:
(抽样汇总)
Sampling Factors: Location: Location matters as ISE-IT projects are located in two major location CONUS and OCONUS.
Customer (Not Relevant: Customers vary but all process are followed even if the customer thinks they are not needed.)
Size (Not Relevant: Size does not change the tailored design/build process.)
Organizational Structure (Not Relevant: Organizational structure is not relevant as ISE-IT work as integrated teams that support multiple projects.)
Type of Work (Not Relevant: Type of work is not relevant as the integrated team is used and interchanged for both locations.)
Sampling Factor Values: OCONUS (Location): EPOC is the largest Europe project and NSHQ is added for sampling.
CONUS (Location): TINMAN is the largest project and is supplemented with 3 other USA project for sampling.
Subgroups: G2: Subgroup contains 2 Europe Projects.
75 People, 2 Basic Units
– OCONUS
G1: Subgroup contains 4 projects
32 People, 4 Basic Units
– CONUS

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:M.C. Dean Inc. Integrated Systems Engineering – Informa