CMMI认证

Desystec SAS-2017-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All the work are done in the same location)
Customer (Not Relevant: No difference in process is due to Customer requirements at this point because for all the current Basic Units the customer is internal)
Size (Not Relevant: All projects in scope are similar in size and the differences do not imply process differences)
Organizational Structure (Not Relevant: All projects follow the same organizational structure guidelines)
Type of Work (Not Relevant: One type of work)
All Projects: Contains all projects in the OU
Sampling Factor Values: All Projects (All Projects): All Projects
Empty (All Projects): The Empty Group
Subgroups: OU Projects: All Projects
7 People, 3 Basic Units
– All Projects

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Desystec SAS-2017-CMMI3