CMMI认证

TXT e-2013-Solutions-2013-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Not relevant. All basic units are leaded by Milan site. People are based on Milan site.)
Customer (Not Relevant: Not relevant. Work is not performed differently depending on the customer served by that work)
Size: Relevant. The O.U. activities can be classified into two different categories, which lead to different implementation of some PAs. Size is based on Budget: 1. Large (Budget) 2. Small (Budget)
Organizational Structure (Not Relevant: Not relevant. Works is not performed differently in different parts of the organizational structure.)
Type of Work: Relevant. The O.U. activities can be classified into two different categories, which lead to different implementation of some PAs: 1. Embedded Software Development 2. Software Development
Duration: Relevant, The O.U. activities can be classified into two different categories, which lead to different implementation of some PAs: 1. Short Project 2. Long Project
Sampling Factor Values: Large (Budget) (Size): Size based on budget
Small (Budget) (Size): Size based on budget
Embedded Software Development (Type of Work): Type of work based on software embedded
Software Development (Type of Work): Type of work based on software development
Short Project (Duration): Duration based on man-day
Long Project (Duration): Duration based on man-day
Subgroups: SG1: This group is related to development of embedded real time systems. This kind of development requires the adherence to specific standard for the avionic domain.
14 People, 3 Basic Units
– Small (Budget)
– Embedded Software Development
– Short Project
SG2: This group is related to PC based platform development. It is related to large projects both in the terms of duration and budget. This kind of project shall be managed carefully due to intense use of resources involved
18 People, 3 Basic Units
– Long Project
– Software Development
– Large (Budget)
SG3: This group is related to PC based platform development having the peculiarity to require large effort in a short time frame. This requires an accurate management of resources, features, stakeholders involvement
7 People, 2 Basic Units
– Large (Budget)
– Software Development
– Short Project
SG4: This group is related to PC based platform development. It is related to small projects both in terms of effort and duration. It requires efficient use of resources and strong cooperation in order to achieve results in short time.
10 People, 4 Basic Units
– Short Project
– Software Development
– Small (Budget)