CMMI认证

Tyco Electronics AMP Korea Ltd.-2015-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: There are three sites in which development projects are performed, however no process implementation differences from locations.)
Customer (Not Relevant: No differences with customers)
Size (Not Relevant: No differences with size)
Organizational Structure (Not Relevant: No differences in organizational structure)
Type of Work: There are differences in process implementation according to type of projects whether software is included or not.
Lifecycle phases: There are differences in process implementation according to when and how many phases the project covers.
Sampling Factor Values: System/Software (Type of Work): The projects with this factor consist of software, hardware and mechanical devices.
Hardware only (Type of Work): The projects with this factor consist of components except software.
Advanced (Lifecycle phases): The projects with this factor are the advanced technology or solution development projects.
Mass production (Lifecycle phases): The projects with this factor are the development projects for mass production.
Subgroups: SUB1: This subgroup includes system and software projects which develop the technology and/or solutions to be transferred into development for mass production.
23 People, 7 Basic Units
– System/Software
– Advanced
SUB2: The projects in this subgroup develop system and software for the mass production.
63 People, 12 Basic Units
– Mass production
– System/Software
SUB3: The projects in this subgroup have no software related job and only development for hardware and/or mechanical parts for mass production.
59 People, 11 Basic Units
– Hardware only
– Mass production

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Tyco Electronics AMP Korea Ltd.-2015-CMMI3