| Sampling Factors: |
Location (Not Relevant: Locations (Xian & Shanghai) do not impact project processes.)
Customer (Not Relevant: Though there are multiple customers and business domains, domain or customer-specific needs or requirements are not leading to implementation differences.)
Size: The small projects could tailor some processes of high level design and low level design; and the design and coding processes will be different from large projects.
Organizational Structure (Not Relevant: All projects follow the same OSSP, there are no department specific processes or guidelines.)
Type of Work (Not Relevant: All projects are development and follow the same OSSP.) |
| Sampling Factor Values: |
Small (Size): The number of developing engineers is less than or equal to three.
Large (Size): The number of developing engineers is more than three. |
| Subgroups: |
1: The number of developing engineers is less than or equal to three.
7 People, 4 Basic Units
– Small
2: The number of developing engineers is more than three.
33 People, 3 Basic Units
– Large |