CMMI认证

Guangdong Electronics Industrial Institute-2013-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Locations of the organizational unit sites have no impact on the way work is performed. The sample covers 100% of the locations.)
Customer (Not Relevant: The customers served by the organizational unit have no impact on the way work is performed.)
Size: The size of the products and services developed by the organizational unit has some impact on the way work is performed. These projects are performed by shared resources and depend on the size of the project. The Major size (> 50 Technical Head Count Months (THCM)), Medium size (between 10 to 50 THMC) and Minor or Enhancement size (< 10=”” thcm).=”” the=”” minor=”” or=”” enhancement=”” project=”” size=”” may=”” adopt=”” the=”” abbreviated=”” version=”” of=””>
Organizational Structure (Not Relevant: The organizational structure of the organizational unit has no impact on the way work is performed.)
Type of Work (Not Relevant: The type of development undertaken by the organizational unit has no impact on the way work is performed.)
Sampling Factor Values: Major Size (Size): This subgroup contains project that is of Major size (>50 THCM).
Medium Size (Size): This subgroup contains project that is of Medium size (10-50 THCM).
Subgroups: Medium: This subgroup contains project that is of Medium size (10-50 THCM).
8 People, 1 Basic Units
– Medium Size
Major: This subgroup contains project that is of Major size (>50 THCM).
20 People, 2 Basic Units
– Major Size

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Guangdong Electronics Industrial Institute-2013-CMMI3