CMMI认证

China Energy Engineering Group Guangdong Electric Power

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All projects are located at a single location.)
Customer (Not Relevant: Customer does not impact process.)
Size: Projects are generally divided into two sizes. This affects the project management and engineering process implementation.
Organizational Structure (Not Relevant: There are no organizational differences among the projects.)
Type of Work (Not Relevant: There are no differences in tailoring. All projects are new development projects.)
Sampling Factor Values: Medium (Size): 6-10 months duration.
Small (Size): Less than 6 months duration.
Subgroups: Medium: Medium size, new development projects
18 People, 3 Basic Units
– Medium