CMMI认证

Millennium Engineering and Integration Company-2016-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: No. See Division – Location is simply by-product of Divisions.)
Customer (Not Relevant: No differences in how projects are run.)
Size (Not Relevant: No differences in how projects are run.)
Organizational Structure: Yes. Work is performed differently in the 2 divisions in scope.
Type of Work (Not Relevant: No.)
Life Cycle: Life cycle does change which parts of the standard process are used.
Sampling Factor Values: COS Office (Organizational Structure): Missiles and Space Division in CO Springs. This office has it”s own detailed procedures supporting the Org Standard Policies and Processes.
FL Office (Organizational Structure): Integrated Systems Division in Suntree, FL. This office has it”s own detailed procedures supporting the Org Standard Policies and Processes.
Agile (Life Cycle): Agile Life Cycle.
Waterfall (Life Cycle): Waterfall Life Cycle,
Subgroups: CO-Agile: There is only 1 program in COS office and it uses Agile development life cycle.
5 People, 1 Basic Units
– COS Office
– Agile
FL-Agile: FL Office – projects using Agile life cycle.
8 People, 2 Basic Units
– Agile
– FL Office
FL-WF: FL Office – Projects using Waterfall life cycle.
6 People, 2 Basic Units
– FL Office
– Waterfall

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Millennium Engineering and Integration Company-2016-CMMI3