CMMI认证

Bosch Engineering GmbH-2016-Sponsor Requests No ML

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Not Relevant: There is only one location, no impact on how the processes are being performed)
Customer (Not Relevant: Not relevant: there are different customers served, but with no impact on how processes are being performed)
Size (Not Relevant: Not Relevant: not relevant since the work is not performed differently based on the size of the basic unit/projects)
Organizational Structure (Not Relevant: Not Relevant: The organization has 2 main divisions, Engineering E/E Systems and Architecture and Development Body and Infotainment Systems. Both use the same process)
Type of Work: relevant since if work is performed slightly differently depending on the project category. Projects categories: study project, development and application project,. Studies projects do not contribute to the revenue of the organization and are used to evaluate ideas for new products.
Sampling Factor Values: Development (Type of Work): development and application project
Study (Type of Work): Study and new idea evaluation projects
Subgroups: G1: Development and application projects
120 People, 20 Basic Units
– Development

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Bosch Engineering GmbH-2016-Sponsor Requests No ML