- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location (Not Relevant: The sampled project performs work in the greater Washington, DC metropolitan area, with no process distinctions due to location.) Customer (Not Relevant: All EC projects perform work directly for Federal Government clients in a
‘Prime’ contractor status or managing the delivery of the project with the standard processes.)
Size (Not Relevant: All EC projects that are equal to or greater than 5 FTEs execute the organizational processes.)
Organizational Structure (Not Relevant: The EC organization is flat, with little difference between the projects’ process execution due to org structure.)
Type of Work (Not Relevant: All projects generally perform the same kind of work. No process distinction based on type of work.)
All Basic Units: All Basic Units where E&C control the processes
Sampling Factor Values: All Basic Unit (All Basic Units): All Basic Units where E&C control the process No Basic Units (All Basic Units): No Basic Untis
Subgroups: Agile Projects: All agile projects in E&C
8 People, 1 Basic Units
– All Basic Unit