CMMI认证

everis Spain, S.L.U.-2017-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location: From the technical point of view this factor is not relevant because every center operates in the same way independently from location; they use same methodology, same tools; they share infrastructure, quality audits, etc. This factor has been selected as relevant because the sponsor asked to explicitally mention each center under the appraisal scope in the SCAMPI register.
Customer (Not Relevant: Not relevant because a customer that work with Everis Centers must accept the standard working protocol established by Everis Centers.)
Size (Not Relevant: The everis Centers methodology does not significantly differentiate the process based on the size; if a project is too big, the methodology asks to split in “smaller ones” that finally are quite similar in terms of size)
Organizational Structure (Not Relevant: This factor is one-to-one correspondent to Location, consequently it has been considered not relevant because the segmentation is guaranteed by Location)
Type of Work: Within the appraisal scope there are significant differences depending on the type of work: DF+DT+CO, DT+CO, COdesdeDT
Sampling Factor Values: Lisbon (Location): Portugal Center location
Tetuán (Location): Morocco Center location
Trujillo (Location): Peru Center location
DF+DT+CO (Type of Work): Request of work that includes Functional Design, Technical Design and Construction
DT+CO (Type of Work): Request of work taht includes Technical Design and Construction
COdesdeDT (Type of Work): Request of work that includes Construction
Subgroups: Tetuán/COdesdeDT: Requests of Work (RoW) that have in input the technical design and that include only the coding phase executed in Tetuán
13 People, 2 Basic Units
– Tetuán
– COdesdeDT
Lisbon/DT+CO: RoW that include the development of Technical Design and Coding executed in Lisbon
2 People, 1 Basic Units
– Lisbon
– DT+CO
Lisbon/COdesdeDT: RoW that have in input the technical design and that include only the coding phase executed in Lisbon
12 People, 3 Basic Units
– Lisbon
– COdesdeDT
Trujillo/DF+DT+CO: Requests of Work (RoW) that include the development of Functional Design, Technical Design and Coding executed in Trujillo
14 People, 1 Basic Units
– DF+DT+CO
– Trujillo
Trujillo/DT+CO: RoW that include the development of Technical Design and Coding executed in Trujillo
2 People, 1 Basic Units
– Trujillo
– DT+CO
Trujillo/COdesdeDT: RoW that have in input the technical design and that include only the coding phase executed in Trujillo
29 People, 2 Basic Units
– Trujillo
– COdesdeDT

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:everis Spain, S.L.U.-2017-CMMI3